
Products
PE Double plugging drawing
The technology of hot tapping and plugging under pressure for PE gas pipeline is suitable for the construction of hot tapping and plugging under pressure for Urban Gas PE pipeline. Under the condition of ensuring the normal operation of PE gas pipeline, the construction operations such as adding bypass, replacing or adding valve and replacing pipe section are carried out for PE pipeline. To avoid the economic loss caused by the shutdown of construction operation and the adverse impact on social production and life.
PE Double plugging drawing:
Model: ≤DN400
Applied medium: Natural gas
Applied pressure: ≤0.4MPa
CONTACT US
Tel:0086-188 7028 5586
Tel/Fax: 0086-790-6869686
Address: No.111 Tantang Road, High-tech Development Zone in
Xinyu City, Jiangxi Province,China
E-mail:800135998@b.qq.com
Zip code:338004
FOLLOW US

Enterprise QQ

Official WeChat
COPYRIGHT@Xinyu FeiHu Pipeline Technical Equipment Co., Ltd.
Jiangxi ICP15011854-1 Powered by www.300.cn